+1(915)295-3666 kuns913@gmail.com 中文

Case Studies

Real-world industrial heat recovery projects with verified energy savings

All Power & Energy Chemical & Petrochemical Food & Beverage Building Materials & Ceramics Textile & Dyeing Pharmaceutical & Medical Data Center Heating & HVAC Public Buildings Modern Agriculture Environmental Protection Mining & Energy
Tunnel Kiln Flue Gas Waste Heat Utilization for a New Building Materials Enterprise
Building Materials & Ceramics 2024

Tunnel Kiln Flue Gas Waste Heat Utilization for a New Building Materials Enterprise

Installed a tubular air preheater in the tunnel kiln flue, using 280C flue gas waste heat to preheat combustion air to 180C, saving about 12% fuel, 2,100 t standard coal per year, 1.5-year payback.

Linyi, Shandong
12% fuel saving, 2,100 t standard coal/year