Real-world industrial heat recovery projects with verified energy savings
Installed a tubular air preheater in the tunnel kiln flue, using 280C flue gas waste heat to preheat combustion air to 180C, saving about 12% fuel, 2,100 t standard coal per year, 1.5-year payback.